Project Value: $125 Million
Owner: TransEd LRT
Scope: Underground storm, sanitary, and water, drainage structures, electrical ducts, soil cells, rain garden, dry pond, underground storage chamber, earthworks, cement stabilized subgrade, granular base course, installation of geotextile/geogrid.
Project Value: $15 Million
Schedule: September 2019 – November 2019
Scope: Ductbank excavation, conduits and concrete installation, backfill excavation, winter protection, heating and hoarding support.
Project Value: $6 Million
Schedule: February 2018 – July 2018
Scope: Removal of bridge and replaced with a bridge file. 2km of road widening. removal of culverts, replace barbed wire fence, asphalt removal, borrow topsoil strip/replace, common excavation, topsoil placement, supply/install geotextiles, subgrade prep, asphalt paving and line painting.
Project Value: $5 Million
Schedule: June 2020 – September 2020
Scope: Tank bases, containment, berm construction, supply & installation of liner. Dealing with muskeg and poor soil conditions. As well as dealing with challenging ground conditions and managing ground improvement program.
Project Value: $15 Million
Schedule: January 2015 – October 2017
Scope: Awarded three contracts for Unit 50 (light end recovery) and Unit 60 (Sulphur Block). Excavation, concrete structures, below grade piping, piling, containment structures, finish grading.
Project Value: $3M
Model: Unit Rate
Schedule: August 2022 – Ongoing
Scope: Structural excavation and backfill, ditch and trench excavation, ditch and trench fill, jersey barriers, plastic pipe & valve installation, equipment & building insulation, utility trench excavation and backfill, cast in place concrete, oil water separator, conduits, buried grounding, grounding rods/earthing electrodes, junction boxes & receptacles, water system trench excavation and fill, water system piling, water system structural demo, water system cast in place concrete, bollards & traffic barriers, and equipment and building insulation.
Project Value: $1M
Model: Unit Rate
Schedule: September 2022 – November 2022
Scope: Topsoil stripping, common excavation (cut), fill, topsoil placement, preparing subgrade surface (first layer), gravel surfacing - Des 2. Class 20-690 m3, granular Fill - Des 6. Class 80-1420 m3, gravel bedding to culvert - Type 1 - 3 m3, culvert - supply & install 500mm dia. - 100 m, culvert - supply & install 300mm dia.- 23 m, erosion control barrier (silt fence)-697 m non-woven geotextile (Class B) - supply & install -10,945.5 m2, drill seeding, reinforced concrete beam for battery containers.